Pages that link to "Item:Q4300228"
From MaRDI portal
The following pages link to Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties (Q4300228):
Displaying 46 items.
- A graph coloring approach to the deployment scheduling and unit assignment problem (Q283268) (← links)
- An agent-based negotiation model on price and delivery date in a fashion supply chain (Q324332) (← links)
- Batching scheduling in a two-level supply chain with earliness and tardiness penalties (Q328087) (← links)
- Scheduling problems with two competing agents to minimized weighted earliness-tardiness (Q339552) (← links)
- Two-agent scheduling on uniform parallel machines with min-max criteria (Q744634) (← links)
- Optimal due date assignment in multi-machine scheduling environments (Q835592) (← links)
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach (Q856080) (← links)
- Scheduling with earliness-tardiness penalties and parallel machines (Q941007) (← links)
- Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system (Q954048) (← links)
- Due dates assignment and JIT scheduling with equal-size jobs (Q976442) (← links)
- Scheduling identical jobs and due-window on uniform machines (Q1038326) (← links)
- Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs (Q1268191) (← links)
- Scheduling with batch setup times and earliness-tardiness penalties (Q1278527) (← links)
- Scheduling under a common due-date on parallel unrelated machines (Q1291766) (← links)
- Multiple-machine scheduling with earliness, tardiness and completion time penalties (Q1302709) (← links)
- Parallel machine scheduling with earliness and tardiness penalties (Q1304513) (← links)
- Effects of change of scale on optimality in a scheduling model with priorities and earliness/tardiness penalties (Q1368414) (← links)
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints. (Q1413824) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem (Q1610145) (← links)
- Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs (Q1761111) (← links)
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints (Q1762106) (← links)
- On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties (Q1765543) (← links)
- Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464) (← links)
- A functional equation that arises in problems of scheduling with priorities and lateness/earliness penalties (Q1804954) (← links)
- Single machine scheduling to minimize the number of early and tardy jobs (Q1919786) (← links)
- Earliness and tardiness scheduling problems on a batch processor (Q1961238) (← links)
- Due-window assignment with identical jobs on parallel uniform machines (Q2355801) (← links)
- Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates (Q2482802) (← links)
- Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs (Q2490167) (← links)
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs (Q2510197) (← links)
- Due-date assignment on uniform machines (Q2519077) (← links)
- Multicriteria scheduling problems: a survey (Q2773166) (← links)
- Just-in-Time Scheduling with Equal-Size Jobs (Q2958671) (← links)
- (Q3135892) (← links)
- (Q4032003) (← links)
- The parallel machine min-max weighted absolute lateness scheduling problem (Q4279270) (← links)
- Multiple common due dates (Q4434513) (← links)
- Hierarchical production planning and scheduling in a multi-product, batch process environment (Q5444475) (← links)
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties (Q5936755) (← links)
- Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date (Q5937351) (← links)
- Minmax earliness-tardiness costs with unit processing time jobs (Q5937720) (← links)
- A common due-data assignment problem on parallel identical machines (Q5953163) (← links)
- Parallel machine scheduling with a common due window (Q5953340) (← links)
- A heuristic for single machine common due date assignment problem with different earliness/tardiness weights (Q6059906) (← links)
- Optimal policies for minimizing total job completion times and deviations from common due dates in unrelated parallel machine scheduling (Q6613982) (← links)