Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464)

From MaRDI portal





scientific article; zbMATH DE number 6953464
Language Label Description Also known as
English
Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem
scientific article; zbMATH DE number 6953464

    Statements

    Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (English)
    0 references
    0 references
    0 references
    12 October 2018
    0 references
    Summary: The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal 1 (unweighted problem). This objective became very significant after the introduction of the Just in Time manufacturing approach. A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined. Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted. When the CDD is restricted, which is a much harder problem, a heuristic algorithm is proposed to find approximate solutions. Through computational experiments, the heuristic algorithms' performance is evaluated with problems up to 500 jobs.
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references