Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem |
scientific article; zbMATH DE number 6953464
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem |
scientific article; zbMATH DE number 6953464 |
Statements
Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (English)
0 references
12 October 2018
0 references
Summary: The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal 1 (unweighted problem). This objective became very significant after the introduction of the Just in Time manufacturing approach. A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined. Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted. When the CDD is restricted, which is a much harder problem, a heuristic algorithm is proposed to find approximate solutions. Through computational experiments, the heuristic algorithms' performance is evaluated with problems up to 500 jobs.
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references