Pages that link to "Item:Q4427326"
From MaRDI portal
The following pages link to A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management (Q4427326):
Displaying 29 items.
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- Time-cost trade-off analysis of project networks in fuzzy environments (Q421542) (← links)
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations (Q440901) (← links)
- An optimisation technique for crashing PERT network in project management (Q545204) (← links)
- Activity consolidation to improve responsiveness (Q706959) (← links)
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem (Q732489) (← links)
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing (Q928039) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- New fuzzy models for time-cost trade-off problem (Q975376) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- A survey on metaheuristics for stochastic combinatorial optimization (Q1024034) (← links)
- Adaptive sample size and importance sampling in estimation-based local search for the probabilistic traveling salesman problem (Q1042104) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Metaheuristic search techniques for multi-objective and stochastic problems: a history of the inventions of Walter J. Gutjahr in the past 22 years (Q1787914) (← links)
- Optimal stochastic single-machine-tardiness scheduling by stochastic branch-and-bound (Q1847179) (← links)
- Managing risk-adjusted resource allocation for project time-cost tradeoffs (Q2095230) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- Enriched workflow modelling and stochastic branch-and-bound (Q2433552) (← links)
- A stochastic multimode model for time-cost tradeoffs under management flexibility (Q2460073) (← links)
- Minorant methods of stochastic global optimization (Q2577236) (← links)
- Scheduling interrelated activities in complex projects under high-order rework: a DSM-based approach (Q2668674) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Distributionally robust project crashing with partial or no correlation information (Q5226590) (← links)
- A hybrid path‐relinking method for solving two‐stage stochastic integer problems (Q5246827) (← links)
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights (Q6090500) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)