Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
An optimisation technique for crashing PERT network in project management - MaRDI portal

Deprecated: Use of MediaWiki\Skin\SkinTemplate::injectLegacyMenusIntoPersonalTools was deprecated in Please make sure Skin option menus contains `user-menu` (and possibly `notifications`, `user-interface-preferences`, `user-page`) 1.46. [Called from MediaWiki\Skin\SkinTemplate::getPortletsTemplateData in /var/www/html/w/includes/Skin/SkinTemplate.php at line 691] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Deprecated: Use of MediaWiki\Skin\BaseTemplate::getPersonalTools was deprecated in 1.46 Call $this->getSkin()->getPersonalToolsForMakeListItem instead (T422975). [Called from Skins\Chameleon\Components\NavbarHorizontal\PersonalTools::getHtml in /var/www/html/w/skins/chameleon/src/Components/NavbarHorizontal/PersonalTools.php at line 66] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Deprecated: Use of QuickTemplate::(get/html/text/haveData) with parameter `personal_urls` was deprecated in MediaWiki Use content_navigation instead. [Called from MediaWiki\Skin\QuickTemplate::get in /var/www/html/w/includes/Skin/QuickTemplate.php at line 131] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

An optimisation technique for crashing PERT network in project management (Q545204)

From MaRDI portal





scientific article; zbMATH DE number 5911189
Language Label Description Also known as
English
An optimisation technique for crashing PERT network in project management
scientific article; zbMATH DE number 5911189

    Statements

    An optimisation technique for crashing PERT network in project management (English)
    0 references
    22 June 2011
    0 references
    Summary: The planning and the subsequent scheduling of a complex project allow us, to identify the duration of the project itself in relation to the assignment costs of the various activities, so as to achieve an acceptable situation of balance between times and costs. This paper presents a method for shortening total project time by determining appropriate activities for crashing in program evaluation review technique (PERT) with a minimum cost. The aim of the study is to crash the pessimistic time in PERT networks by investing the additional amount of money in the activities on the critical path.
    0 references
    project management
    0 references
    PERT
    0 references
    crashing
    0 references
    project duration