Pages that link to "Item:Q4887786"
From MaRDI portal
The following pages link to On-line Control Model for Cost-simulation Network Projects (Q4887786):
Displaying 11 items.
- Determining the timing of project control points using a facility location model and simulation (Q337592) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- Controlled alternative activity networks for project management (Q1107431) (← links)
- Maximin dynamical probabilistic model of design control (Q1390714) (← links)
- Optimal timing of project control points (Q1590030) (← links)
- Three-parametrical harmonization model in project management by means of simulation (Q1614038) (← links)
- An intranet-based cost control system (Q1852134) (← links)
- Harmonization simulation model for managing several stochastic projects (Q1861528) (← links)
- A dynamic model for managing overlapped iterative product development (Q2456432) (← links)
- On-line control model for network construction projects (Q4367030) (← links)
- Timing control points via simulation for production systems under random disturbances (Q5960773) (← links)