Pages that link to "Item:Q492849"
From MaRDI portal
The following pages link to A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning (Q492849):
Displaying 3 items.
- Robust transmission network expansion planning in energy systems: improving computational performance (Q320617) (← links)
- The improved screening curve method regarding existing units (Q1694353) (← links)
- Climate-aware generation and transmission expansion planning: a three-stage robust optimization approach (Q2242403) (← links)