Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning - MaRDI portal

A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning (Q492849)

From MaRDI portal





scientific article; zbMATH DE number 6474578
Language Label Description Also known as
English
A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning
scientific article; zbMATH DE number 6474578

    Statements

    A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning (English)
    0 references
    0 references
    0 references
    0 references
    21 August 2015
    0 references
    OR in energy
    0 references
    robust optimization
    0 references
    transmission expansion planning
    0 references

    Identifiers