Pages that link to "Item:Q5202821"
From MaRDI portal
The following pages link to Single-machine scheduling subject to stochastic breakdowns (Q5202821):
Displaying 50 items.
- Scheduling deteriorating jobs on a single machine subject to breakdowns (Q539453) (← links)
- Scheduling on a single processor subject to interruptions in processing (Q761954) (← links)
- Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns (Q829166) (← links)
- Scheduling for stability in single-machine production systems (Q835553) (← links)
- Two machine scheduling under disruptions with transportation considerations (Q880527) (← links)
- Single machine stochastic JIT scheduling problem subject to machine breakdowns (Q931488) (← links)
- Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties (Q943438) (← links)
- Single machine flow-time scheduling with a single breakdown (Q1111018) (← links)
- Assessing the effects of machine breakdowns in stochastic scheduling (Q1116880) (← links)
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function (Q1129910) (← links)
- On stochastic machine scheduling with general distributional assumptions (Q1291772) (← links)
- Optimal match-up strategies in stochastic scheduling (Q1346690) (← links)
- Scheduling in stochastic flowshops with independent setup, processing and removal times (Q1366705) (← links)
- Bounds on optimal values in stochastic scheduling (Q1375116) (← links)
- General stochastic single-machine scheduling with regular cost functions (Q1381780) (← links)
- Optimal rules for single machine scheduling with stochastic breakdowns (Q1717990) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance (Q1761146) (← links)
- Stochastically minimizing total flowtime in flowshops with no waiting space (Q1806645) (← links)
- Match-up scheduling under a machine breakdown (Q1806884) (← links)
- Selecting jobs for scheduling on a machine subject to failure (Q1917234) (← links)
- Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities (Q1919170) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns (Q2434320) (← links)
- Single machine scheduling under potential disruption (Q2457274) (← links)
- Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model (Q2471329) (← links)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness (Q2563893) (← links)
- Stochastic programming approaches to stochastic scheduling (Q2564886) (← links)
- Minimizing makespan on a single machine subject to random breakdowns (Q2583704) (← links)
- Minimizing maximum tardiness on a single machine with family setup times and machine disruption (Q2668648) (← links)
- Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria (Q3156754) (← links)
- Scheduling stochastic jobs on a single machine subject to breakdowns (Q3325426) (← links)
- Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs (Q3354454) (← links)
- The effect of service time variability on maximum queue lengths in M<sup><i>X</i></sup>/G/1 queues (Q3367759) (← links)
- A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair (Q3415869) (← links)
- A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown–The Preemptive Repeat Model (Q3416018) (← links)
- Evaluating the effects of machine breakdowns in stochastic scheduling problems (Q3793927) (← links)
- Single Machine Scheduling Problem When the Machine Capacity Varies Stochastically (Q4004744) (← links)
- Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs (Q4367265) (← links)
- Scheduling problems with random processing times under expected earliness/tardiness costs (Q4487018) (← links)
- Single–machine scheduling with random machine breakdowns and randomly compressible processing times (Q4495504) (← links)
- A note on scheduling parallel machines subject to breakdown and repair (Q4651709) (← links)
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns (Q4849306) (← links)
- Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms (Q5060784) (← links)
- Scheduling jobs that are subject to failure propagation (Q5688021) (← links)
- Integrated production planning and preventive maintenance in deteriorating production systems (Q5900277) (← links)
- Scheduling with unexpected machine breakdowns (Q5936454) (← links)
- Stochastic single machine scheduling with an exponentially distributed due date (Q5945390) (← links)
- Single-machine scheduling with maintenance and repair rate-modifying activities (Q5955079) (← links)
- A two-stage robust approach for minimizing the weighted number of tardy jobs with objective uncertainty (Q6103748) (← links)