Pages that link to "Item:Q5378662"
From MaRDI portal
The following pages link to On a Congestion Problem in an Aircraft Factory (Q5378662):
Displaying 5 items.
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585) (← links)
- The analysis of a single base in an airlift operation (Q1085777) (← links)
- Waiting-Line Theory as a Management Tool (Q5378691) (← links)
- Letter to the Editor—Applicability of the Lognormal Distribution to Servicing Times in Congestion Problems (Q5378849) (← links)
- Multi-server, Finite Waiting Room,<i>M/G/c/K</i>Optimization Models (Q6160336) (← links)