Pages that link to "Item:Q5444509"
From MaRDI portal
The following pages link to Using dispatching rules for job shop scheduling with due date-based objectives (Q5444509):
Displaying 13 items.
- Dynamic routing strategies for JIT production in hybrid flow shops (Q339696) (← links)
- Fuzzy job-shop scheduling problems: a review (Q506738) (← links)
- Lot-order assignment applying priority rules for the single-machine total tardiness scheduling with nonnegative time-dependent processing times (Q1665667) (← links)
- A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints (Q1752766) (← links)
- Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232) (← links)
- A simulation-optimization framework for generating dynamic dispatching rules for stochastic job shop with earliness and tardiness penalties (Q2669778) (← links)
- Reducing tardy jobs by integrating process planning and scheduling functions (Q3055274) (← links)
- Dynamic job shop scheduling for missed due date performance (Q3055352) (← links)
- A hybrid dynamic pre-emptive and competitive neural-network approach in solving the multi-objective dispatching problem for TFT-LCD manufacturing (Q3163381) (← links)
- Simulation study of job shop scheduling with due dates (Q3778530) (← links)
- Integration of priority dispatching and due-date assignment in a job shop (Q3799803) (← links)
- Dispatching rules for scheduling in assembly jobshops - Part 1 (Q4497234) (← links)
- An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q5172564) (← links)