Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Rule-based scheduling in wafer fabrication with due date-based objectives |
scientific article; zbMATH DE number 6106634
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Rule-based scheduling in wafer fabrication with due date-based objectives |
scientific article; zbMATH DE number 6106634 |
Statements
Rule-based scheduling in wafer fabrication with due date-based objectives (English)
0 references
15 November 2012
0 references
semiconductor manufacturing
0 references
wafer fabrication
0 references
scheduling
0 references
dispatching rules
0 references
on-time delivery
0 references
tardiness
0 references
0 references
0 references
0 references
0 references