Pages that link to "Item:Q5928378"
From MaRDI portal
The following pages link to The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (Q5928378):
Displaying 7 items.
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823) (← links)
- A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- Heuristics for the<i>N</i>-product,<i>M</i>-stage, economic lot sizing and scheduling problem with dynamic demand (Q3369501) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- Economical production and transshipment policy for coordinating multiple production sites (Q5497383) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)