Pages that link to "Item:Q954024"
From MaRDI portal
The following pages link to Scheduling of coupled tasks and one-machine no-wait robotic cells (Q954024):
Displaying 13 items.
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Scheduling of coupled tasks with unit processing times (Q600841) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Identical coupled task scheduling: polynomial complexity of the cyclic case (Q906560) (← links)
- The coupled unit-time operations problem on identical parallel machines with respect to the makespan (Q1667166) (← links)
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times (Q1762161) (← links)
- Coupled task scheduling with exact delays: literature review and models (Q2282490) (← links)
- Two-machine flowshop scheduling problem with coupled-operations (Q2327688) (← links)
- Two machines flow shop with reentrance and exact time lag (Q2805477) (← links)
- On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates (Q3026720) (← links)
- Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots (Q5438627) (← links)
- A binary search algorithm for the general coupled task scheduling problem (Q6057721) (← links)
- The coupled task scheduling problem: an improved mathematical program and a new solution algorithm (Q6195035) (← links)