Pages that link to "Item:Q1010280"
From MaRDI portal
The following pages link to Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan (Q1010280):
Displaying 9 items.
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times (Q879286) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546) (← links)
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (Q1765532) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times (Q2293429) (← links)
- A data intensive heuristic approach to the two-stage streaming scheduling problem (Q2402350) (← links)
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (Q2571194) (← links)
- Lot streaming for a two-stage assembly system in the presence of handling costs (Q6136078) (← links)