Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan (Q1010280)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan |
scientific article; zbMATH DE number 5539868
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan |
scientific article; zbMATH DE number 5539868 |
Statements
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan (English)
0 references
3 April 2009
0 references
assembly flowshop
0 references
bicriteria
0 references
makespan
0 references
maximum lateness
0 references
heuristic
0 references
0 references
0 references