Pages that link to "Item:Q1069850"
From MaRDI portal
The following pages link to A V-shape property of optimal schedule of jobs about a common due date (Q1069850):
Displaying 23 items.
- Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties (Q943438) (← links)
- Survey of scheduling research involving due date determination decisions (Q1111925) (← links)
- V-shape property of optimal sequence of jobs about a common due date on a single machine (Q1121777) (← links)
- Proof of a conjecture of Schrage about the completion time variance problem (Q1183389) (← links)
- Scheduling to minimize weighted earliness and tardiness about a common due-date (Q1186924) (← links)
- Single machine scheduling with coefficient of variation minimization (Q1205688) (← links)
- V-shape property for optimal schedules with monotone penalty functions (Q1206390) (← links)
- A hybrid simulated annealing approach for single machine scheduling problems with non-regular penalty functions (Q1207198) (← links)
- On the general solution for a class of early/tardy problems (Q1207204) (← links)
- Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method (Q1266599) (← links)
- A dominant subset of \(V\)-shaped sequences for a class of single machine sequencing problems (Q1266600) (← links)
- \(V\)-shape property for job sequences that minimize the expected completion time variance (Q1278193) (← links)
- Scheduling about a common due date with job-dependent asymmetric earlines and tardiness penalties (Q1278719) (← links)
- \(V\)- and \(\Lambda\)-shaped properties for optimal single machine schedules for a class of non-separable penalty functions (Q1390208) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464) (← links)
- Machine scheduling with earliness, tardiness and non-execution penalties (Q1886873) (← links)
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem (Q1893607) (← links)
- Scheduling with monotonous earliness and tardiness penalties (Q2366084) (← links)
- Minimization of total absolute deviation for a common due date (Q3534456) (← links)
- Optimal scheduling of jobs about a common due date on a single machine (Q3986089) (← links)
- A Note on the V-shaped Property in One-Machine Scheduling (Q4834095) (← links)
- A heuristic for single machine common due date assignment problem with different earliness/tardiness weights (Q6059906) (← links)