Pages that link to "Item:Q1200773"
From MaRDI portal
The following pages link to On the economic lot scheduling problem with backlogging: The common cycle approach (Q1200773):
Displaying 9 items.
- Lower bounds for the economic lot scheduling problem using aggregation (Q761933) (← links)
- An extension of the extended basic period approach for economic lot scheduling problems (Q1072929) (← links)
- The common cycle economic lot scheduling problem with backorders: Benefits of controllable production rates (Q1359127) (← links)
- Single item lot-sizing problems with backlogging on a single machine at a finite production rate (Q1887789) (← links)
- A common cycle approach for solving the economic lot and inspection scheduling problem (Q2358853) (← links)
- Economic lot scheduling with uncontrolled co-production (Q2475821) (← links)
- Determining a common production cycle time for an economic lot scheduling problem with deteriorating items (Q2496087) (← links)
- The economic lot scheduling problem with finite backorder costs (Q4018286) (← links)
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (Q5558823) (← links)