The following pages link to A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751):
Displaying 50 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- An effective approach for scheduling coupled activities in development projects (Q319026) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile (Q1121783) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem (Q1266548) (← links)
- A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags (Q1293191) (← links)
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem (Q1401645) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems (Q1768898) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling (Q1806914) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints (Q2029253) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Revenue sharing for resource reallocation among project activity contractors (Q2241246) (← links)
- Solving RCPSP/max by lazy clause generation (Q2434317) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A branch-and-bound algorithm for RCPSP with variable resource requirements and variable multiple resource availability constraints (Q2720679) (← links)
- Simplifying activity networks under generalized precedence relations to extended CPM networks (Q2829161) (← links)
- A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem (Q2892296) (← links)
- A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem (Q2893339) (← links)
- Tropical optimization problems in time-constrained project scheduling (Q2970392) (← links)
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time (Q3064043) (← links)
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints (Q3114652) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (Q4032492) (← links)
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem (Q4367245) (← links)
- An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem (Q4469137) (← links)
- Scheduling contractors' farm‐to‐farm crop harvesting operations (Q5488239) (← links)
- SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY (Q5708849) (← links)