Pages that link to "Item:Q1410120"
From MaRDI portal
The following pages link to An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. (Q1410120):
Displaying 14 items.
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823) (← links)
- An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers (Q947958) (← links)
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines (Q1025264) (← links)
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers (Q1585811) (← links)
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints (Q1762015) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Scheduling jobs on a \(k\)-stage flexible flow-shop (Q2271811) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers (Q2475841) (← links)
- EVALUATING PERFORMANCE OF FLOW LINE SYSTEMS WITH BLOCKING UNDER FUZZY ENVIRONMENTS (Q3393514) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines (Q3605446) (← links)
- Computationally efficient approximations for balanced flowlines with finite intermediate buffers (Q4735021) (← links)
- Method of rescheduling for hybrid production lines with intermediate buffers (Q5150030) (← links)