Pages that link to "Item:Q1585811"
From MaRDI portal
The following pages link to Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers (Q1585811):
Displaying 23 items.
- A mixed integer linear programming model for simultaneous design and scheduling of flowshop plants (Q346031) (← links)
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823) (← links)
- Modeling realistic hybrid flexible flowshop scheduling problems (Q941540) (← links)
- A memetic algorithm for the flexible flow line scheduling problem with processor blocking (Q954039) (← links)
- A note of using effective immune based approach for the flow shop scheduling with buffers (Q1045843) (← links)
- An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. (Q1410120) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line (Q1848633) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm (Q2433464) (← links)
- A Lagrangean relaxation approach for the mixed-model flow line sequencing problem (Q2456653) (← links)
- An effective hybrid genetic algorithm for flow shop scheduling with limited buffers (Q2489134) (← links)
- MIP Formulations for Flowshop Scheduling with Limited Buffers (Q2999340) (← links)
- Capacity-filtering algorithms for finite-capacity planning of a flexible flow line (Q3055437) (← links)
- EVALUATING PERFORMANCE OF FLOW LINE SYSTEMS WITH BLOCKING UNDER FUZZY ENVIRONMENTS (Q3393514) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- Computationally efficient approximations for balanced flowlines with finite intermediate buffers (Q4735021) (← links)
- Method of rescheduling for hybrid production lines with intermediate buffers (Q5150030) (← links)
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing (Q5438563) (← links)
- Optimal scheduling for flexible job shop operation (Q5466730) (← links)
- A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach (Q5478815) (← links)