Pages that link to "Item:Q1644059"
From MaRDI portal
The following pages link to An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times (Q1644059):
Displaying 3 items.
- Four decades of research on the open-shop scheduling problem to minimize the makespan (Q2239884) (← links)
- Multi-objective open shop scheduling by considering human error and preventive maintenance (Q2307240) (← links)
- Minimizing the weighted sum of quadratic completion times on a single machine (Q4859582) (← links)