Pages that link to "Item:Q1902498"
From MaRDI portal
The following pages link to A maximum principle based combined method for scheduling in a flexible manufacturing system (Q1902498):
Displaying 12 items.
- Dynamic generalized assignment problems with stochastic demands and multiple agent-task relationships (Q556008) (← links)
- A continuous-time average-cost flexible manufacturing and operator scheduling model solved by deconvexification over time (Q1120468) (← links)
- Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP) (Q1291708) (← links)
- Optimal scheduling in parallel and serial manufacturing systems via the maximum principle (Q1580435) (← links)
- Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case (Q1603316) (← links)
- Optimal control of assembling complexes under predetermined maintenance conditions (Q1819269) (← links)
- A discounted-cost continuous-time flexible manufacturing and operator scheduling model solved by deconvexification over time (Q2805310) (← links)
- A Note On Application Of Maximum Principle To H.M.M.S. Model For Production And Work-Force Planning (Q3337925) (← links)
- A Discrete Time Average Cost Flexible Manufacturing and Operator Scheduling Model Solved by Deconvexification Over Time (Q3783822) (← links)
- A study of scheduling rules of flexible manufacturing systems: A simulation approach (Q4245522) (← links)
- Optimal Flow Control for Continuous‐time Scheduling in Flexible Manufacturing Systems (Q4884095) (← links)
- Scheduling concurrent production over a finite planning horizon: Polynomially solvable cases (Q5926599) (← links)