A maximum principle based combined method for scheduling in a flexible manufacturing system (Q1902498)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A maximum principle based combined method for scheduling in a flexible manufacturing system |
scientific article; zbMATH DE number 819185
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A maximum principle based combined method for scheduling in a flexible manufacturing system |
scientific article; zbMATH DE number 819185 |
Statements
A maximum principle based combined method for scheduling in a flexible manufacturing system (English)
0 references
13 May 1996
0 references
continuous time dynamic model
0 references
discrete scheduling
0 references
manufacturing
0 references
maximum principle
0 references