Pages that link to "Item:Q2257346"
From MaRDI portal
The following pages link to Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs (Q2257346):
Displaying 8 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms (Q1721321) (← links)
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs (Q4655459) (← links)
- On the two-stage assembly flow shop problem (Q6592922) (← links)