Pages that link to "Item:Q2629637"
From MaRDI portal
The following pages link to Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637):
Displaying 6 items.
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (Q706971) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system (Q2286964) (← links)
- An efficient MILP-based decomposition strategy for solving large-scale scheduling problems in the shipbuilding industry (Q2302367) (← links)
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs (Q4655459) (← links)