Pages that link to "Item:Q2663741"
From MaRDI portal
The following pages link to Makespan minimization for parallel jobs with energy constraint (Q2663741):
Displaying 6 items.
- Scheduling parallel jobs to minimize the makespan (Q880560) (← links)
- Discrete-continuous scheduling to minimize the makespan for power processing rates of jobs (Q1293204) (← links)
- Minimizing total completion time in multiprocessor job systems with energy constraint (Q2117638) (← links)
- Speed scaling scheduling of multiprocessor jobs with energy constraint and makespan criterion (Q2149611) (← links)
- Approximation algorithms for energy-efficient scheduling of parallel jobs (Q2215201) (← links)
- Preemptive scheduling of parallel jobs of two sizes with controllable processing times (Q6547139) (← links)