Pages that link to "Item:Q3116676"
From MaRDI portal
The following pages link to Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines (Q3116676):
Displaying 9 items.
- Discrete-time, economic lot scheduling problem on multiple, non-identical production lines (Q421620) (← links)
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing (Q932268) (← links)
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification (Q1733088) (← links)
- Economic lot scheduling with resources in parallel (Q2997891) (← links)
- Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach (Q3008607) (← links)
- Resource allocation with lumpy demand: To speed or not to speed? (Q3156729) (← links)
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors (Q3478249) (← links)
- Submodularity in Conic Quadratic Mixed 0–1 Optimization (Q5131480) (← links)