Discrete-time, economic lot scheduling problem on multiple, non-identical production lines (Q421620)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Discrete-time, economic lot scheduling problem on multiple, non-identical production lines |
scientific article; zbMATH DE number 6035076
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Discrete-time, economic lot scheduling problem on multiple, non-identical production lines |
scientific article; zbMATH DE number 6035076 |
Statements
Discrete-time, economic lot scheduling problem on multiple, non-identical production lines (English)
0 references
14 May 2012
0 references
lot-sizing
0 references
scheduling
0 references
beam search
0 references
matheuristicm
0 references
resource allocation
0 references
0 references
0 references
0 references
0 references
0 references
0.91187716
0 references
0.9014571
0 references
0.8970146
0 references
0.8914356
0 references
0.8799019
0 references
0.87966806
0 references
0.8794162
0 references
0.8792613
0 references