Pages that link to "Item:Q3313600"
From MaRDI portal
The following pages link to Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (Q3313600):
Displaying 50 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- Minimization of project time and cost under constrained reliability index in the disjunctive project model (Q384696) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Time-constrained project scheduling with adjacent resources (Q709144) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- A network flow procedure for project crashing with penalty nodes (Q790038) (← links)
- Time-constrained project scheduling (Q835591) (← links)
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Scheduling of project networks (Q908839) (← links)
- Fuzzy project scheduling problem and its hybrid intelligent algorithm (Q967803) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem (Q994252) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Heuristics for multimode scheduling problems with dedicated resources (Q1296081) (← links)
- A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods (Q1374387) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- A characterization for tropical polynomials being the minimum finishing time of project networks (Q1797241) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Resource levelling for projects with schedule-dependent time windows (Q1806946) (← links)
- Advanced DSS for scheduling: Software engineering aspects and the role of eigenmodels (Q1897420) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- Single-machine scheduling with an external resource (Q2030286) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Negotiation mechanisms for the multi-agent multi-mode resource investment problem (Q2239866) (← links)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Mixed integer programming formulations for the biomass truck scheduling problem (Q2358168) (← links)
- A metaheuristic solution approach for the time-constrained project scheduling problem (Q2362168) (← links)
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (Q2366078) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (Q2479156) (← links)
- Scatter search for project scheduling with resource availability cost (Q2570160) (← links)
- Project scheduling problem with stochastic activity duration times (Q2572685) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem (Q2656542) (← links)
- Complexity of the project scheduling problem with credits (Q3186838) (← links)
- Stochastic scheduling problems I — General strategies (Q3216419) (← links)