The following pages link to The concrete delivery problem (Q337044):
Displaying 11 items.
- Exact algorithms for single-machine scheduling with time windows and precedence constraints (Q310349) (← links)
- Modelling and solving for ready-mixed concrete scheduling problems with time dependence (Q391727) (← links)
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete (Q857351) (← links)
- Analysis, modeling and solution of the concrete delivery problem (Q954932) (← links)
- A hybrid of a LP and statistics approach to evaluate a transportation model for a ready concrete company (Q1019568) (← links)
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problems (Q1038296) (← links)
- Towards a decision support system for the ready concrete distribution system: a case of a Greek company. (Q1412756) (← links)
- Survey of quantitative methods in construction (Q1651605) (← links)
- Integer linear programming models for a cement delivery problem (Q1926974) (← links)
- Mixed integer programming formulations for the biomass truck scheduling problem (Q2358168) (← links)
- OR PRACTICE—The Dance of the Thirty-Ton Trucks: Dispatching and Scheduling in a Dynamic Environment (Q3392150) (← links)