Pages that link to "Item:Q391727"
From MaRDI portal
The following pages link to Modelling and solving for ready-mixed concrete scheduling problems with time dependence (Q391727):
Displaying 5 items.
- Analysis, modeling and solution of the concrete delivery problem (Q954932) (← links)
- A hybrid of a LP and statistics approach to evaluate a transportation model for a ready concrete company (Q1019568) (← links)
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problems (Q1038296) (← links)
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194) (← links)
- OR PRACTICE—The Dance of the Thirty-Ton Trucks: Dispatching and Scheduling in a Dynamic Environment (Q3392150) (← links)