Pages that link to "Item:Q398905"
From MaRDI portal
The following pages link to A cutting and scheduling problem in float glass manufacturing (Q398905):
Displaying 5 items.
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan (Q1750472) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- A heuristic to schedule flexible job-shop in a glass factory (Q1772853) (← links)
- Solving a large cutting problem in the glass manufacturing industry (Q2189955) (← links)
- Mathematical modeling and optimal blank generation in glass manufacturing (Q2336874) (← links)