A cutting and scheduling problem in float glass manufacturing (Q398905)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A cutting and scheduling problem in float glass manufacturing |
scientific article; zbMATH DE number 6331194
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A cutting and scheduling problem in float glass manufacturing |
scientific article; zbMATH DE number 6331194 |
Statements
A cutting and scheduling problem in float glass manufacturing (English)
0 references
18 August 2014
0 references
cutting
0 references
scheduling
0 references
float line
0 references
glass
0 references
hybrid flow shop
0 references
cyclic schedule
0 references
0.8810285
0 references
0 references
0.84589124
0 references
0 references
0.83418745
0 references
0.8207997
0 references
0.81209886
0 references
0.81189173
0 references
0.8108851
0 references