The following pages link to Francisco Ballestín (Q400051):
Displaying 20 items.
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- A population-based approach to the resource-constrained project scheduling problem (Q702733) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- Resource-constrained project scheduling: A critical activity reordering heuristic (Q1399574) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Mathematical models to improve the current practice in a home healthcare unit (Q2178910) (← links)
- Scheduling and rescheduling elective patients in operating rooms to minimise the percentage of tardy patients (Q2327961) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Meta-heuristics for stable scheduling on a single machine (Q2468477) (← links)
- Pre-emption in resource-constrained project scheduling (Q2482791) (← links)
- (Q3426430) (← links)
- (Q3426434) (← links)
- (Q3518847) (← links)
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem (Q3605435) (← links)
- Different Codifications and Metaheuristic Algorithms for the Resource Renting Problem with Minimum and Maximum Time Lags (Q3625018) (← links)
- A multistage heuristic for storage and retrieval problems in a warehouse with random storage (Q6069771) (← links)