Pages that link to "Item:Q421620"
From MaRDI portal
The following pages link to Discrete-time, economic lot scheduling problem on multiple, non-identical production lines (Q421620):
Displaying 8 items.
- The generalized scheduling problem for discrete production. II (Q372282) (← links)
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing (Q932268) (← links)
- Planning of multi-product pipelines by economic lot scheduling models (Q1694354) (← links)
- Economic lot scheduling problems incorporating a cost of using the production facility (Q3055413) (← links)
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines (Q3116676) (← links)
- Resource allocation with lumpy demand: To speed or not to speed? (Q3156729) (← links)
- Economic lot scheduling problem with imperfect production processes and setup times (Q4656665) (← links)
- Graph coloring approaches for a production planning problem with makespan and setup penalties in a product-wheel context (Q6559404) (← links)