Pages that link to "Item:Q4849306"
From MaRDI portal
The following pages link to Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns (Q4849306):
Displaying 24 items.
- Minimizing makespan for scheduling stochastic job shop with random breakdown (Q388592) (← links)
- A bicriteria flowshop scheduling problem with setup times (Q865584) (← links)
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function (Q1129910) (← links)
- On stochastic machine scheduling with general distributional assumptions (Q1291772) (← links)
- Two-machine ordered flowshop scheduling under random breakdowns (Q1341394) (← links)
- Scheduling in stochastic flowshops with independent setup, processing and removal times (Q1366705) (← links)
- Two-stage no-wait scheduling models with setup and removal times separated (Q1374028) (← links)
- Total flowtime in no-wait flowshops with separated setup times. (Q1406685) (← links)
- Two-machine flowshop group scheduling problem (Q1577379) (← links)
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (Q1765532) (← links)
- Scheduling under machine breakdown in a continuous process industry (Q1765549) (← links)
- Stochastically minimizing total flowtime in flowshops with no waiting space (Q1806645) (← links)
- Two-stage production scheduling with an outsourcing option (Q2275802) (← links)
- Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty (Q2294752) (← links)
- A two-machine flowshop scheduling problem with a separated maintenance constraint (Q2456646) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness (Q2563893) (← links)
- A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times (Q2572851) (← links)
- Numerical investigation of optimal policies for production flow control and set-up scheduling: Lessons from two-part-type failure-prone FMSs (Q4252098) (← links)
- Improvements in the power of empirical stochastic dominance comparisons through kernel density estimation: a monte carlo study (Q4253288) (← links)
- Uncertain flexible flow shop scheduling problem subject to breakdowns (Q5275883) (← links)
- A new heuristic and dominance relations for no-wait flowshops with setups (Q5936136) (← links)
- Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times (Q6094376) (← links)
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown (Q6179225) (← links)