Pages that link to "Item:Q5174108"
From MaRDI portal
The following pages link to A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108):
Displaying 9 items.
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty (Q747027) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- GA, SA and RB/KB-based hybrid method in FMS scheduling (Q2704885) (← links)
- An improved ant algorithm for multi-mode resource constrained project scheduling problem (Q2928436) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- Multi-mode resource constrained project scheduling problem along with contractor selection (Q5889173) (← links)