Pages that link to "Item:Q840154"
From MaRDI portal
The following pages link to Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration (Q840154):
Displaying 26 items.
- An improved two-machine flowshop scheduling with intermediate transportation (Q266074) (← links)
- Single-machine scheduling with precedence constraints and position-dependent processing times (Q350351) (← links)
- A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size (Q398896) (← links)
- Two-agent single-machine scheduling problems under increasing linear deterioration (Q552491) (← links)
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation (Q555434) (← links)
- Single-machine scheduling problems with both deteriorating jobs and learning effects (Q611502) (← links)
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (Q632667) (← links)
- Single-machine scheduling with nonlinear deterioration (Q691413) (← links)
- A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (Q693472) (← links)
- Single machine scheduling with sum-of-logarithm-processing-times based deterioration (Q726391) (← links)
- A two-stage flow shop scheduling problem with transportation considerations (Q904289) (← links)
- A note on single-machine scheduling with decreasing time-dependent job processing times (Q967802) (← links)
- Some single-machine scheduling with sum-of-processing-time-based and job-position-based processing times (Q1788956) (← links)
- New results on the coordination of transportation and batching scheduling (Q2290566) (← links)
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times (Q2290581) (← links)
- Improved MILP models for two-machine flowshop with batch processing machines (Q2389826) (← links)
- Minimizing makespan in a two-machine flowshop scheduling with batching and release time (Q2390059) (← links)
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924) (← links)
- Single-machine scheduling with time-and-resource-dependent processing times (Q2428936) (← links)
- Permutation flow shop problem with shortening job processing times (Q2821099) (← links)
- Makespan minimization on three-machine flow shop with deteriorating jobs (Q2873830) (← links)
- New complexity results on scheduling problem in a robotic cell (Q4603936) (← links)
- Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations (Q4632837) (← links)
- Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs (Q5348802) (← links)
- Machine scheduling with transportation considerations (Q5932281) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)