Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (Q632667)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-machine flowshop scheduling with intermediate transportation under job physical space consideration |
scientific article; zbMATH DE number 5870580
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-machine flowshop scheduling with intermediate transportation under job physical space consideration |
scientific article; zbMATH DE number 5870580 |
Statements
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (English)
0 references
25 March 2011
0 references
coordinated scheduling
0 references
logistics
0 references
flowshop
0 references
worst-case analysis
0 references