Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Minimizing makespan in two-stage hybrid cross docking scheduling problem |
scientific article; zbMATH DE number 5506634
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Minimizing makespan in two-stage hybrid cross docking scheduling problem |
scientific article; zbMATH DE number 5506634 |
Statements
Minimizing makespan in two-stage hybrid cross docking scheduling problem (English)
0 references
12 February 2009
0 references
machine scheduling
0 references
logistics
0 references
cross docking
0 references
0 references