Two-phase heuristics for scheduling of multiple projects (Q1019555)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-phase heuristics for scheduling of multiple projects |
scientific article; zbMATH DE number 5561293
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-phase heuristics for scheduling of multiple projects |
scientific article; zbMATH DE number 5561293 |
Statements
Two-phase heuristics for scheduling of multiple projects (English)
0 references
3 June 2009
0 references
Summary: This paper deals with the problem of scheduling of multiple projects sharing a common pool of resources. New two-phase heuristics are proposed and compared with the existing single and two-phase heuristics. These two-phase heuristics are based on a two-stage prioritisation process of activities for resource allocation in which, at any decision point, the projects are first prioritised as per project selection rule and eligible activities in the projects are then prioritised as per activity selection rule. The two-phase heuristics are categorized into look-ahead and non-look-ahead type based on the project selection rules used. Performance of the heuristics is evaluated in two stages for two performance measures -- minimising mean project delay and minimising increase over critical project duration. The results show that the some look-ahead heuristics produces better schedules when used with appropriate minimum/maximum criterion. The results also show that the heuristics which are superior in minimising mean project delay generally perform poorly in minimising increase over critical project duration.
0 references
multi-project scheduling
0 references
resource constraints
0 references
look-ahead heuristics
0 references
multiple projects
0 references
project selection rules
0 references
performance measures
0 references
non-look-ahead heuristics
0 references