Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length (Q1062615)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length |
scientific article; zbMATH DE number 3914066
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length |
scientific article; zbMATH DE number 3914066 |
Statements
Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length (English)
0 references
1985
0 references
The problem considered is one of production scheduling of lots of unit- time operations on identical machines. Operations are precedence related and form a tree. For each operation two parameters are specified: the first giving the required number of operations (units of a given product) to be made and the second defining for each arc (i,j) the number of units of product i used to produce a unit of product j. The objective is to find a schedule of minimum length. A polynomial-time algorithm based on Hu's algorithm for scheduling trees is given.
0 references
parallel machines
0 references
production scheduling
0 references
unit-time operations
0 references
identical machines
0 references
minimum length
0 references
polynomial-time algorithm
0 references
0 references