Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Optimal common due-date with limited completion time deviation - MaRDI portal

Optimal common due-date with limited completion time deviation (Q1097833)

From MaRDI portal





scientific article; zbMATH DE number 4035557
Language Label Description Also known as
English
Optimal common due-date with limited completion time deviation
scientific article; zbMATH DE number 4035557

    Statements

    Optimal common due-date with limited completion time deviation (English)
    0 references
    1988
    0 references
    Given a set of n jobs with deterministic processing times and the same ready times, the problem is to find the optimal common flow allowance \(k^*\) for the common due-date assignment method, and the optimal job sequence \(\sigma^*\) to minimize a penalty function of missing due- dates. It is assumed that penalty will not occur if the deviation of job completion from the due-date is sufficiently small. Three lemmas are presented and a numerical example is provided to illustrate the use of the results to determine the optimal solution to the due-date determination and sequencing problem.
    0 references
    optimal common flow allowance
    0 references
    common due-date assignment method
    0 references
    optimal job sequence
    0 references