Scheduling a two-stage hybrid flowshop with separable setup and removal times (Q1333533)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling a two-stage hybrid flowshop with separable setup and removal times |
scientific article; zbMATH DE number 639333
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling a two-stage hybrid flowshop with separable setup and removal times |
scientific article; zbMATH DE number 639333 |
Statements
Scheduling a two-stage hybrid flowshop with separable setup and removal times (English)
0 references
15 September 1994
0 references
two-stage flowshop scheduling
0 references
identical parallel machines
0 references
polynomial optimization algorithm
0 references
NP-completeness
0 references
heuristic algorithms
0 references