An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal |
scientific article; zbMATH DE number 698912
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal |
scientific article; zbMATH DE number 698912 |
Statements
An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (English)
0 references
1 December 1994
0 references
\(n\) jobs, \(M\) machines flowshop scheduling
0 references
makespan
0 references
setup, processing and removal times
0 references
heuristic
0 references
bottleneck machines
0 references
0 references
0 references
0.89334214
0 references
0.8839981
0 references
0.8828559
0 references
0.8727292
0 references
0.86943865
0 references
0.86928785
0 references
0.8691536
0 references