Solution methods for material requirement planning with lot-size dependent lead times (Q1383130)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Solution methods for material requirement planning with lot-size dependent lead times |
scientific article; zbMATH DE number 1138476
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Solution methods for material requirement planning with lot-size dependent lead times |
scientific article; zbMATH DE number 1138476 |
Statements
Solution methods for material requirement planning with lot-size dependent lead times (English)
0 references
2 April 1998
0 references
material requirement planning
0 references
Lagrangian relaxation
0 references
dynamic programming
0 references
mixed zero-one programming
0 references
0.86424184
0 references
0.86418587
0 references
0.85715556
0 references
0.8523513
0 references
0.8495359
0 references
0.8437367
0 references
0.84337664
0 references
0.84219986
0 references