Scheduling a flowline manufacturing cell with sequence dependent family setup times (Q1580980)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling a flowline manufacturing cell with sequence dependent family setup times |
scientific article; zbMATH DE number 1507978
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling a flowline manufacturing cell with sequence dependent family setup times |
scientific article; zbMATH DE number 1507978 |
Statements
Scheduling a flowline manufacturing cell with sequence dependent family setup times (English)
0 references
23 November 2000
0 references
flowshop scheduling
0 references
manufacturing cells
0 references
heuristic algorithms
0 references
empirical results
0 references
0.9260267
0 references
0.92183584
0 references
0.9146613
0 references
0.91147554
0 references
0.90660995
0 references
0 references
0 references
0.8964824
0 references
0.89408505
0 references
0.8934387
0 references