A beam-search-based constructive heuristic for the PFSP to minimise total flowtime (Q1652234)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A beam-search-based constructive heuristic for the PFSP to minimise total flowtime |
scientific article; zbMATH DE number 6901382
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A beam-search-based constructive heuristic for the PFSP to minimise total flowtime |
scientific article; zbMATH DE number 6901382 |
Statements
A beam-search-based constructive heuristic for the PFSP to minimise total flowtime (English)
0 references
11 July 2018
0 references
scheduling
0 references
flowshop
0 references
heuristics
0 references
flowtime
0 references
PFSP
0 references
beam search
0 references
total completion time
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0.86018467
0 references
0.8464785
0 references
0.8372032
0 references
0.8298097
0 references
0.82692474
0 references
0.82134306
0 references
0.8206501
0 references