Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time (Q1720427)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time |
scientific article; zbMATH DE number 7018502
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time |
scientific article; zbMATH DE number 7018502 |
Statements
Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time (English)
0 references
8 February 2019
0 references
Summary: An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated. We introduce the factor of overtime work into the model to improve the manufacturer's production. In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously. By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy. We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references