Parallel-batch scheduling with two models of deterioration to minimize the makespan (Q1724245)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Parallel-batch scheduling with two models of deterioration to minimize the makespan |
scientific article; zbMATH DE number 7022486
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Parallel-batch scheduling with two models of deterioration to minimize the makespan |
scientific article; zbMATH DE number 7022486 |
Statements
Parallel-batch scheduling with two models of deterioration to minimize the makespan (English)
0 references
14 February 2019
0 references
Summary: We consider the bounded parallel-batch scheduling with two models of deterioration, in which the processing time of the first model is \(p_j = a_j + \alpha t\) and of the second model is \(p_j = a + \alpha_j t\). The objective is to minimize the makespan. We present \(O(n \text{log} n)\) time algorithms for the single-machine problems, respectively. And we propose fully polynomial time approximation schemes to solve the identical-parallel-machine problem and uniform-parallel-machine problem, respectively.
0 references
0 references
0 references
0 references